PROJECTS
TRAFFIC ENGINEERING TECHNICAL STUDY FOR DETERMINING THE FUNCTIONAL DESIGN OF THE INTEGRATED TRANSPORTATION SYSTEM FOR THE MUNICIPALITY OF IRAPUATO, GUANAJUATO
Client: Municipality of Irapuato, Guanajuato From February 10, 2020 to November 3, 2020 Modelistica carried out the functional and operational design and the conceptual design of the first stage of the Irapuato SIT, which also included the financial model of the...
ANALYSIS OF ECONOMIC, ENVIRONMENTAL AND LEGAL PRE-FEASIBILITY FOR THE CONSTRUCTION OF THE PARAÍSO BYPASS, IN THE STATE OF TABASCO (FROM AUGUST 20, 2019 TO NOVEMBER 18, 2019)
Client: Infraestructura Pública Privada S.C. (IPP) for the Ministry of Transportation and Communications (SCT) The contract consisted in determining the most appropriate route for the bypass, preparing the demand study, estimating investment costs based on the...
STUDY OF TECHNICAL CONSIDERATIONS REGARDING THE PUBLIC SERVICE OF RENTAL TRANSPORTATION WITHOUT A FIXED ROUTE (TAXI) AND SPECIAL SERVICE OF EXECUTIVE TRANSPORTATION FOR THE MUNICIPALITIES IN THE STATE OF GUANAJUATO (FROM NOVEMBER 15, 2019 TO THE PRESENT)
Client: Government Secretariat of the Executive Branch of the Government of the State of Guanajuato Modelistica worked on a detailed analysis of the individual transportation service system (taxis) that operates in the state of Guanajuato, either the conventional...
STUDY FOR THE DEVELOPMENT OF AN INTEGRATED TRANSPORTATION SYSTEM FOR THE METROPOLITAN AREA OF TAMPICO – MADERO – ALTAMIRA, IN THE STATE OF TAMAULIPAS (FROM OCTOBER 10, 2019 TO PRESENT)
Client: META Desarrollo S.A. de C.V. for the State of Tamaulipas The design of an Integrated Public Transportation System for the Metropolitan Area of Tampico was carried out. The study included an extensive collection of field data, the structuring of a...
ANALYSIS AND OPERATIONAL VERIFICATION OF THE URBAN ARTICULATED TRANSPORT NETWORK (RUTA) (FROM JUNE 13, 2019 – JULY 29, 2019)
Client: Toll Roads of the State of Puebla The contract consisted in the diagnosis of the current operational and financial conditions of the RUTA system in Puebla and the identification of gaps where the operation and the business plan can be improved. A new...