Client: Toll Roads of the State of Puebla
The contract consisted in the diagnosis of the current operational and financial conditions of the RUTA system in Puebla and the identification of gaps where the operation and the business plan can be improved. A new operational and functional plan was designed, a monitoring system for the operation was proposed based on key indicators and an update of the financial model was performed to evaluate the finances of the system as a whole. Additionally, recommendations were made on the structure of contracts with operators, with suggestions for their administration.