Client: Infraestructura Pública Privada S.C. (IPP) for the Ministry of Transportation and Communications (SCT)
The contract consisted in determining the most appropriate route for the bypass, preparing the demand study, estimating investment costs based on the conceptual design, the preliminary environmental assessment and the cost-benefit analysis of the new bypass that will provide access to the Dos Bocas Refinery.