by ostyx | May 6, 2021 | Proyecto
Client: Infraestructura Pública Privada S.C. (IPP) for the Ministry of Transportation and Communications (SCT) The contract consisted in determining the most appropriate route for the bypass, preparing the demand study, estimating investment costs based on the...
by ostyx | May 6, 2021 | Proyecto
Client: Toll Roads of the State of Puebla The contract consisted in the diagnosis of the current operational and financial conditions of the RUTA system in Puebla and the identification of gaps where the operation and the business plan can be improved. A new...
by ostyx | May 6, 2021 | Proyecto
Client: META Desarrollo S.A. de C.V. for the State of Tamaulipas The design of an Integrated Public Transportation System for the Metropolitan Area of Tampico was carried out. The study included an extensive collection of field data, the structuring of a...
by ostyx | May 6, 2021 | Proyecto
Client: Government Secretariat of the Executive Branch of the Government of the State of Guanajuato Modelistica worked on a detailed analysis of the individual transportation service system (taxis) that operates in the state of Guanajuato, either the conventional...
by ostyx | May 6, 2021 | Proyecto
Client: Municipality of Irapuato, Guanajuato From February 10, 2020 to November 3, 2020 Modelistica carried out the functional and operational design and the conceptual design of the first stage of the Irapuato SIT, which also included the financial model of the...